Today's question: Are there any plans to connect Watson Lake to the grid by running a line from Teslin?
Thanks for the question. The short answer is no, at least not in the near term. At this point there aren't enough customers to justify the cost of such a line. In the longer term, we might look at building a line if we were able to connect to the North American grid, something that is currently unaffordable for us.
Comments
Be the first to comment
Commenting is not available in this channel entry.